Riho is a comfortable two-storey summer house or a permanent home for a smaller family.
In front of the cottage is a terrace. On the ground floor there is a cosy living room with a fireplace. The living room is connected to an open kitchen. There is also a sauna and a large bathroom with access to the second terrace.
On the first floor there is a nice lounge and two bedrooms, both with access tot the balcony.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
We selected Palmatin thanks to fast feedback and informational webpage. There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
Compare to other and more standard buildings, the log houses are easy and fast to assemble. As the houses are manufactured first in the factory, they can be delivered and assembled on the construction site at any moment of the year. However, it is important to keep a construction site clean from snow, leaves or debris, to ensure the safety of the workers and the good organisation on the site.
We control the manufacturing pipeline from end to finish by doing everything ourselves. Costs stay down because there are no sales middle-men. It also means manufacturing quality can be fully monitored and therefore guaranteed at all stages of the manufacturing process.
The constructions obligations can vary from a country to another. Generally speaking, when the building exceeds a certain size, the construction is subject to a permit. This concerns private properties as well. Before delivering a construction permit, the plans of the house, the location, the environment, the public safety and other factors will be analyzed. To know about the regulations, you should refer to your local administration. Make sure to obtain the building permit before starting the construction on the site.
The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.