Talk to our expert online, or call +372 605 4895
4804 houses made since 1995

Villu

2 Floors
3 Bedrooms
2 Bathrooms
310.5 m² Total area
286.7 m² Living area
144 m² Terrace/balcony area

Villu is a magnificent log clubhouse with a massive terrace and impressingly grand vestibule.

On the ground floor there is a spacious dining area and a separate large kitchen with extra storage room. There is another storage room (or wardrobe) behind next to the kitchen, behind the staircase. The vestibule has a cosy lounge area with a fireplace creating a warm and relaxing ambiance.

There is also a reception area and a separate office next to it. Also on the ground floor are 2 bathrooms/locker-rooms opposite two restrooms. The first floor can be accessed either from the staircase in the vestibule or the staircase on the terrace.

On the first floor is another restroom and one more storage room/utilities room. There is a large hall leading to the balcony and the bedrooms. There are two bedrooms for 4 people and one bedroom for 2 people. In the bedrooms for 4 there is a cosy sitting area and a wall separating the sleeping area, two beds on each side.

There is a wonderful overview of the grounds from the balcony and a staircase down to the terrace. The terrace is ideal for outdoor dining and clubhouse summer parties.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Title
This field is hidden when viewing the form
Newsletter

  • Accommodation for 10 People
  • A Grand Vestibule and Cosy Lounge

Technical information

Number of bathrooms
2
Number of bedrooms
3
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
310.5 m²
Living area
286.7 m²
Terrace/balcony area
144 m²

Similar Houses

Private: Motel

  • Floors: 2
  • Total area: 242.2 m²
  • Living area: 242.2 m²
  • Bedrooms: 6
  • Bathrooms: 6
  • Terrace/balcony area: 89.4 m²

Tamme

  • Floors: 2
  • Total area: 212.1 m²
  • Living area: 195.8 m²
  • Bedrooms: 3
  • Bathrooms: 1
  • Terrace/balcony area: 48.3 m²

Testimonials

Family Ranna Log home

We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.

Log home Margus

The role of Sales consultant was very important. Your competitors (we tried three-four producers) sales consultants weren’t adequate. Palmatin sales consultant was very helpful and we always got information that we needed. The whole selling process was made professionally and this was the main reason why we selected Palmatin.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    The Basic Package includes all the essential materials needed to start building your log house. This package provides the production-approved drawings, load-bearing log walls, roof structures with underlay material, waterproofing, and ventilation strips. For multi-storey log houses, it also includes the structures for the intermediate floors. With this package, you receive the core construction elements necessary to assemble the main structure of your home. The Basic Package is ideal if you wish to take part in the construction process and carry out a larger portion of the work yourself while maintaining full control over the project.

  • Standard

    The Standard Package includes everything from the Basic Package, plus all the materials needed to complete the exterior of your log house. This includes exterior finishing elements such as cladding details, mouldings, skirting boards, terraces, balconies, and wind protection materials. Windows and doors can be ordered separately and added to the package. The Standard Package is a great choice if you want your home’s exterior to be finished quickly and weather-protected, while continuing the interior works at your own pace.

  • Premium

    The Premium Package includes everything from the Basic and Standard Packages, plus all the materials required for building the interior walls and ceilings up to the installation of building boards. All boards and fastening accessories are carefully prepared and packed for your convenience. As with the Standard Package, windows and doors can be ordered separately and included in your package. You can also add stairs, stair railings (for multi-storey houses), and roofing materials for a more complete solution. The Premium Package is the most comprehensive and convenient option, providing nearly all the materials needed to finish the log house structure and prepare it for interior completion efficiently and effortlessly.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Jaan Köönvere

+372 605 48 95

Frequently Asked Questions

What machines are needed for construction on the plot?

Building a wooden house or prefabricated house on a construction site requires preliminary preparations and the availability of machines. You should first be ensured that the necessary and common tools (hammer, screwdrivers…) can be provided. To unload and move the log and prefabricated elements, a crane is necessary. A waste container might be placed to keep the site clean. Works-at-height have to be realized on a secured scaffolding. If a team is present on the construction site, additional material might be needed. Palmatin provides in advance the instructions and advice to prepare correctly the construction site.

Can I build the log house myself?

If you are looking for adventure and enriching experience, you can, of course, decide to build the log house by yourself. The construction on site consists of assembling the different elements, following the instructions. Our advice would be to consider in advance all the positive and negative aspects to not underestimate the work before starting. You can contact us for advice and assistance at any step of the assembly.

Is there any ground to privileged for the construction of a wooden house or a prefabricated house?

To build a wooden house or prefabricated house, the type of ground is not problematic. Any ground type may suit for building the houses. Moreover, wooden houses are recommended in seismic areas. Their resistance to horizontal earth movements make them less likely to collapse compared to other buildings.
To make sure that your house will be maintained in good conditions, the foundations have to be adapted to the grounds.

What are the different steps when I buy a house with Palmatin?

You think about building your house, and you are ready to move forward with this beautiful project? Here are the steps when buying a house with Palmatin. First, contact us to discuss your project, needs and expectations. Based on your requirements, we establish an accurate quotation. If you accept the project, we agree and start working on the design and drawings. We carefully inspect all the technical aspects and engineering details of the construction. If you are satisfied, we launch the production of the house at our factory. After a few months from the project start, the house is ready and transported to the construction site, where it will be assembled during few weeks only.