Talk to our expert online, or call +372 605 4895
4604 houses made since 1995

Villu

2 Floors
3 Bedrooms
2 Bathrooms
310.5 m² Total area
286.7 m² Living area
144 m² Terrace/balcony area

Villu is a magnificent log clubhouse with a massive terrace and impressingly grand vestibule.

On the ground floor there is a spacious dining area and a separate large kitchen with extra storage room. There is another storage room (or wardrobe) behind next to the kitchen, behind the staircase. The vestibule has a cosy lounge area with a fireplace creating a warm and relaxing ambiance.

There is also a reception area and a separate office next to it. Also on the ground floor are 2 bathrooms/locker-rooms opposite two restrooms. The first floor can be accessed either from the staircase in the vestibule or the staircase on the terrace.

On the first floor is another restroom and one more storage room/utilities room. There is a large hall leading to the balcony and the bedrooms. There are two bedrooms for 4 people and one bedroom for 2 people. In the bedrooms for 4 there is a cosy sitting area and a wall separating the sleeping area, two beds on each side.

There is a wonderful overview of the grounds from the balcony and a staircase down to the terrace. The terrace is ideal for outdoor dining and clubhouse summer parties.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
Newsletter
This field is for validation purposes and should be left unchanged.

  • Accommodation for 10 People
  • A Grand Vestibule and Cosy Lounge

Technical information

Number of bathrooms
2
Number of bedrooms
3
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
310.5 m²
Living area
286.7 m²
Terrace/balcony area
144 m²

Similar Houses

Private: Motel

  • Floors: 2
  • Total area: 242.2 m²
  • Living area: 242.2 m²
  • Bedrooms: 6
  • Bathrooms: 6
  • Terrace/balcony area: 89.4 m²

Tamme

  • Floors: 2
  • Total area: 212.1 m²
  • Living area: 195.8 m²
  • Bedrooms: 3
  • Bathrooms: 1
  • Terrace/balcony area: 48.3 m²

Testimonials

foundations
PALMATIN CUSTOMER STORY

PALMATIN CUSTOMER STORY

Family Ranna Log home

We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Jaan Köönvere

+372 605 48 95

Frequently Asked Questions

Does a log house / prefabricated need to be built during summer?

Compare to other and more standard buildings, the log houses are easy and fast to assemble. As the houses are manufactured first in the factory, they can be delivered and assembled on the construction site at any moment of the year. However, it is important to keep a construction site clean from snow, leaves or debris, to ensure the safety of the workers and the good organisation on the site.

How long to build a log / prefabricated house?

The size of the house and the logs used are influencing the settlement duration of the house. For example, the solid log profiles take longer to be installed than the glued laminated log profiles. Since the settlement is taken into notice during the engineering process you can move into your new home right away. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.

The size of the house is the main element influencing the settlement duration of a prefabricated house. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.

Does the houses comply with the French RT2012 insulation standard?

In Europe, buildings represent approximately 40% of the total energy consumption and 36% of the CO2 emissions and are therefore the single largest energy consumer in Europe, ahead of industrial sectors. A house is considered as passive when its energy demand is lower than 15 kWh/ m²/ year and its total energy consumption (including cooling, domestic hot water, use of devices and technical equipment, lighting, ventilation and consumption linked to building use) does not exceed 120 kWh/ m²/ year. The RT 2012 norm considers a building as “low energy” as soon as its consumption is limited to 50 kWh/ m²/ year, including lighting, heating, air conditioning and hot water. The RT 2012 norm is based on renewable energy. To reduce energy consumption and building emissions, environmentally friendly and renewable energy sources (solar panels, heating pumps…) are efficient solutions. All Palmatin constructions are complying with the RT 2012 norm and reach the energy efficiency requirements.

What preparation to make on the construction site before the assembly of the house?

Before starting the assembly of the house, and even before receiving the delivery, it is primordial to check that the construction site is correctly prepared. Always check the security of the site for workers. The construction site has to be clean and the storage area prepared. You may also verify that the site is delimited and protected, to stop anyone not related to work from entering the construction site.