Sven is a well-planned two-storey log house ideal for a family of 4. This house is well-suited to a person who values privacy and separate rooms.
On the ground floor is a spacious living room with access to the terrace, and a semi-detached corner with a fireplace perfect for relaxing and reading. This leads to the master bedroom which has a separate wardrobe and direct access to the bathroom.
The bathroom can also be accessed from the hallway on the opposite side. The hallway between the bathroom and kitchen also leads to a second exterior door.
On the other side of the house are two more bedrooms and a study. On the first floor there is a L-shaped loft with a balcony on each end. This is a great place for family film nights or children’s birthday parties.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.
The role of Sales consultant was very important. Your competitors (we tried three-four producers) sales consultants weren’t adequate. Palmatin sales consultant was very helpful and we always got information that we needed. The whole selling process was made professionally and this was the main reason why we selected Palmatin.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
The Basic Package includes all the essential materials needed to start building your log house. This package provides the production-approved drawings, load-bearing log walls, roof structures with underlay material, waterproofing, and ventilation strips. For multi-storey log houses, it also includes the structures for the intermediate floors. With this package, you receive the core construction elements necessary to assemble the main structure of your home. The Basic Package is ideal if you wish to take part in the construction process and carry out a larger portion of the work yourself while maintaining full control over the project.
The Standard Package includes everything from the Basic Package, plus all the materials needed to complete the exterior of your log house. This includes exterior finishing elements such as cladding details, mouldings, skirting boards, terraces, balconies, and wind protection materials. Windows and doors can be ordered separately and added to the package. The Standard Package is a great choice if you want your home’s exterior to be finished quickly and weather-protected, while continuing the interior works at your own pace.
The Premium Package includes everything from the Basic and Standard Packages, plus all the materials required for building the interior walls and ceilings up to the installation of building boards. All boards and fastening accessories are carefully prepared and packed for your convenience. As with the Standard Package, windows and doors can be ordered separately and included in your package. You can also add stairs, stair railings (for multi-storey houses), and roofing materials for a more complete solution. The Premium Package is the most comprehensive and convenient option, providing nearly all the materials needed to finish the log house structure and prepare it for interior completion efficiently and effortlessly.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
The size of the house and the logs used are influencing the settlement duration of the house. For example, the solid log profiles take longer to be installed than the glued laminated log profiles. Since the settlement is taken into notice during the engineering process you can move into your new home right away. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.
The size of the house is the main element influencing the settlement duration of a prefabricated house. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.
The type of foundation needed has more to do with the properties of the soil and ground on the building site and the size of the house. You can use any type of foundation (pier foundation, strip foundation, base slab).
Before reaching the construction site, only the round logs are treated at the factory. It is also possible to treat the wood before the arrival of the house on the construction site. The treatment at the factory is an option.
We know that a house has to comply with clients wishes, expectations and needs. All our models are customizable and we realize houses from our clients’ plans. This also means that it is, of course, possible to design houses for persons with special needs and integrate all the essential elements to their comfort and well-being.