Two-storey log house Teele is well-suited to a family with 2 children.
The house has 2 large terraces – on in front of the house and one in the back, perfect for sunbathing or outdoor dining. On the ground floor is a spacious and well-lighted living are with a fireplace, access to the second terrace and first floor.
The dining area is slightly separated from the living room and also has an access to the terrace as well as the separate kitchen on the opposite side of the house. Nest to the kitchen is the utility room for a washer and drier. Also on the ground floor is the master bedroom and a sauna with a bathroom and a spacious lounge.
On the first floor there are 2 more bedrooms and a second bathroom.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
If you are looking for adventure and enriching experience, you can, of course, decide to build the log house by yourself. The construction on site consists of assembling the different elements, following the instructions. Our advice would be to consider in advance all the positive and negative aspects to not underestimate the work before starting. You can contact us for advice and assistance at any step of the assembly.
The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.
Like any other consumption goods, the VAT applied to the house cost is 20%.
As a log and prefabricated house producer, we value the environment and the nature, quality and durable products. Our goal is to participate to a sustainable future. We provide comfort and value the health of our clients and their satisfaction. We manage our supply and our production with careful attention, and we place our clients at the very heart of our concern.