Talk to our expert online, or call +372 605 4895
4724 houses made since 1995

Helen

2 Floors
3 Bedrooms
2 Bathrooms
168 m² Total area
162.9 m² Living area
74 m² Terrace/balcony area

Helen is a light and beautiful two-storey log house suited for everyone who values comfort and open spaces.

Near the front entrance there is a separate wardrobe for all outerwear. On the left hand is the sauna, with a bathroom and large lounge to relax with family or friends. A washing machine and drier can easily be fit into the bathroom. On the opposite side of the house, there is a spacious living room combined with a dining room and kitchen. The house has a great terrace reaching two sides of the house.

On the first floor there is another bathroom and 3 bedrooms.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Title
This field is hidden when viewing the form
Newsletter

  • Spacious Living and Dining Area
  • Large Terrace For Enjoyable Evenings

Technical information

Number of bathrooms
2
Number of bedrooms
3
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
168 m²
Living area
162.9 m²
Terrace/balcony area
74 m²

Similar Houses

Private: Priit

  • Floors: 2
  • Total area: 170.1 m²
  • Living area: 135.7 m²
  • Bedrooms: 4
  • Bathrooms: 1
  • Terrace/balcony area: 0 m²

Rebeka

  • Floors: 2
  • Total area: 168.7 m²
  • Living area: 153.4 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 46 m²

Testimonials

Log home Margus

The role of Sales consultant was very important. Your competitors (we tried three-four producers) sales consultants weren’t adequate. Palmatin sales consultant was very helpful and we always got information that we needed. The whole selling process was made professionally and this was the main reason why we selected Palmatin.

Family Roosve log house

We selected Palmatin thanks to fast feedback and informational webpage.  There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    The Basic Package includes all the essential materials needed to start building your log house. This package provides the production-approved drawings, load-bearing log walls, roof structures with underlay material, waterproofing, and ventilation strips. For multi-storey log houses, it also includes the structures for the intermediate floors. With this package, you receive the core construction elements necessary to assemble the main structure of your home. The Basic Package is ideal if you wish to take part in the construction process and carry out a larger portion of the work yourself while maintaining full control over the project.

  • Standard

    The Standard Package includes everything from the Basic Package, plus all the materials needed to complete the exterior of your log house. This includes exterior finishing elements such as cladding details, mouldings, skirting boards, terraces, balconies, and wind protection materials. Windows and doors can be ordered separately and added to the package. The Standard Package is a great choice if you want your home’s exterior to be finished quickly and weather-protected, while continuing the interior works at your own pace.

  • Premium

    The Premium Package includes everything from the Basic and Standard Packages, plus all the materials required for building the interior walls and ceilings up to the installation of building boards. All boards and fastening accessories are carefully prepared and packed for your convenience. As with the Standard Package, windows and doors can be ordered separately and included in your package. You can also add stairs, stair railings (for multi-storey houses), and roofing materials for a more complete solution. The Premium Package is the most comprehensive and convenient option, providing nearly all the materials needed to finish the log house structure and prepare it for interior completion efficiently and effortlessly.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Jaan Köönvere

+372 605 48 95

Frequently Asked Questions

Is a wooden house energy-efficient?

Thanks to building methods, modular – or prefabricated houses – are remarkable in term of energy saving. This type of construction gives the possibility to choose alternative energy power sources and environment-friendly installations. The effective insulation will also guarantee you a pleasant interior climate and the reduction of energy bills.

How can I decorate my prefabricated house?

The prefabricated house is built by assembling on the construction site the prefabricated house elements produced in the factory. Once the assembly is achieved, the exterior and interior of the house can be decorated freely. Outside, you can select wooden cladding, plaster facade elements, stone imitation, mosaic or plastered mineral insulation. The interior can be decorated with paint, wallpaper, wood, stone and any other type of finishing. Wood, carpet flooring, tiles and flexible flooring can be used for the floor, among other materials. Many elements can also be suitable for the ceiling. Discover some options of interior finishing in our catalogue: “Additional elements and accessories“.

What are the different steps when I buy a house with Palmatin?

You think about building your house, and you are ready to move forward with this beautiful project? Here are the steps when buying a house with Palmatin. First, contact us to discuss your project, needs and expectations. Based on your requirements, we establish an accurate quotation. If you accept the project, we agree and start working on the design and drawings. We carefully inspect all the technical aspects and engineering details of the construction. If you are satisfied, we launch the production of the house at our factory. After a few months from the project start, the house is ready and transported to the construction site, where it will be assembled during few weeks only.

How long does it take to deliver the house to the construction site?

Many factors can influence the duration of transportation and date of shipment and delivery. The transportation mean, the location of delivery, the weather, the road traffic and other unpredictable events can impact the transportation duration. In Europe and unless specific conditions apply, a driver is not allowed to drive more than 6 consecutive hours. At maximum, he can work 9 hours per day, 10 hours per night. Per week, a driver is limited to 48hours in average. At Palmatin, we organize  the transportation of the materials so you can receive all the materials to the construction site as planned.