Helen is a light and beautiful two-storey log house suited for everyone who values comfort and open spaces.
Near the front entrance there is a separate wardrobe for all outerwear. On the left hand is the sauna, with a bathroom and large lounge to relax with family or friends. A washing machine and drier can easily be fit into the bathroom. On the opposite side of the house, there is a spacious living room combined with a dining room and kitchen. The house has a great terrace reaching two sides of the house.
On the first floor there is another bathroom and 3 bedrooms.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We selected Palmatin thanks to fast feedback and informational webpage. There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.
We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
Building a wooden house or prefabricated house on a construction site requires preliminary preparations and the availability of machines. You should first be ensured that the necessary and common tools (hammer, screwdrivers…) can be provided. To unload and move the log and prefabricated elements, a crane is necessary. A waste container might be placed to keep the site clean. Works-at-height have to be realized on a secured scaffolding. If a team is present on the construction site, additional material might be needed. Palmatin provides in advance the instructions and advice to prepare correctly the construction site.
The type of foundation needed has more to do with the properties of the soil and ground on the building site and the size of the house. You can use any type of foundation (pier foundation, strip foundation, base slab).
The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.
The environment protection is one of our essential pillars and objectives. To build wooden houses and respect environment, we focus on our production and the management of our products. The FSC certifications attest that the wood materials are coming from controlled plantations. We support the renewal of the forests. In our constructions, we use toxin-free glue, that does not interact with the environment. Plus, the wood is an ecological, biodegradable and renewable material. About the production, we have organised our process to manage our environmental impact. Our ecological and certified waste-free production allows us to reduce energy consumption. We avoid releasing unfriendly elements in the nature. The wooden waste from the production is collected and reused. We use sawdust and kiln driers to warm the factory. Also, suction system prevents the sawdust and warmth from being rejected in the environment. We work to provide a sustainable environment for the years to come.