fbpx
Talk to our expert online, or call +372 605 4895
4524 houses made since 1995

Aleks

1 Floors
0 Bedrooms
1 Bathrooms
22.4 m² Total area
22.4 m² Living area
0 m² Terrace/balcony area

Aleks is a lovely smaller log sauna with a pool.

This is a great place for spending time with friends. Entering the house there is a cosy lounge with a fireplace. The sauna is nice and roomy and you can cool yourself in the pool.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
Newsletter
This field is for validation purposes and should be left unchanged.

  • A Pool
  • Cosy Lounge with Fireplace

Floor plans

Technical information

Number of bathrooms
1
Number of bedrooms
0
Number of floors
1
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
22.4 m²
Living area
22.4 m²
Terrace/balcony area
0 m²

Similar Houses

Siim

  • Floors: 1
  • Total area: 15.9 m²
  • Living area: 15.9 m²
  • Bathrooms: 1
  • Terrace/balcony area: 6.9 m²

Tiit

  • Floors: 2
  • Total area: 37.2 m²
  • Living area: 27.5 m²
  • Bedrooms: 1
  • Bathrooms: 1
  • Terrace/balcony area: 15.13 m²

Testimonials

Family Ranna Log home

We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.

Family Roosve log house

We selected Palmatin thanks to fast feedback and informational webpage.  There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Jaan Köönvere

+372 605 48 95

Frequently Asked Questions

What kind of products should be used for the inner and outer finishes of log houses?

The exterior of the wooden house is composed with the round or square log and wooden elements such doors and windows frames, eventually doors and windows, railings, porch… Therefore, the finishing for outside should be adapted to exterior conditions and made for wood care. If not coloured, the wood needs at minimum to be protected from external attacks like sun UV, bad weather or season changes. You can rely on the care instructions and informative documentation to know what stain, oil or paint should be privileged and how often they have to be refreshed. The terraces and balconies flooring can be finished at the factory if desired. Inside, a wooden house can adopt traditional and modern appearances according to the finish choices. The interior can be decorated with wooden cladding, wooden ceiling panels and parquet, paint, stones, decorative panels or wallpaper on the walls. Tiles, laminate or carpet flooring can be used for the floor, and you can opt for stretched canvas, concrete or panels for the ceiling. Like any other type of house, you are free to decorate your interior with all the materials available in the design. Discover some options of interior finishing in our catalogue “Additional elements and accessories”.

How long does it take from the date of the order to delivery?

The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.

What preparation to make on the construction site before the assembly of the house?

Before starting the assembly of the house, and even before receiving the delivery, it is primordial to check that the construction site is correctly prepared. Always check the security of the site for workers. The construction site has to be clean and the storage area prepared. You may also verify that the site is delimited and protected, to stop anyone not related to work from entering the construction site.

Is the wood treated?

Before reaching the construction site, only the round logs are treated at the factory. It is also possible to treat the wood before the arrival of the house on the construction site. The treatment at the factory is an option.