Two-storey log house Vaher has classic beautiful design and great functional planning.
There is a garage for one car and a separate storage room for bicycles etc. Entering the house there is a nice vestibule with a staircase and next to it a large closet which can be built to a walk-in wardrobe. From the hall you can access the utilities room which leads to the bathroom and sauna. On the ground floor there is a spacious living and dining area ideal for spending time with your family or friends. The dining area is also connected to an open kitchen from where you can access the terrace.
On the first floor there are 3 bedrooms, one with a balcony. There is also a small extra storage room and a second bathroom.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
PALMATIN CUSTOMER STORY
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
The erection costs are directly related to the amount of work needed and to the location of the new house. When doing primary calculations, you should consider the costs to be around 30% (+-5%) of the house price.
Compare to other and more standard buildings, the log houses are easy and fast to assemble. As the houses are manufactured first in the factory, they can be delivered and assembled on the construction site at any moment of the year. However, it is important to keep a construction site clean from snow, leaves or debris, to ensure the safety of the workers and the good organisation on the site.
You can decide when building your home to be helped by a professional. The assembly cost of a house, made by a professional, will be related to the amount of work and the location of the house. In general, it is considered that the costs of the assembly are around 30% (with a variation of +/- 5%) of the house price. You can use the help of one of our partners or search for a professional of your own choice. Contact us to know more.
The size of the house and the logs used are influencing the settlement duration of the house. For example, the solid log profiles take longer to be installed than the glued laminated log profiles. Since the settlement is taken into notice during the engineering process you can move into your new home right away. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.
The size of the house is the main element influencing the settlement duration of a prefabricated house. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.