Two-storey log house Teele is well-suited to a family with 2 children.
The house has 2 large terraces – on in front of the house and one in the back, perfect for sunbathing or outdoor dining. On the ground floor is a spacious and well-lighted living are with a fireplace, access to the second terrace and first floor.
The dining area is slightly separated from the living room and also has an access to the terrace as well as the separate kitchen on the opposite side of the house. Nest to the kitchen is the utility room for a washer and drier. Also on the ground floor is the master bedroom and a sauna with a bathroom and a spacious lounge.
On the first floor there are 2 more bedrooms and a second bathroom.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
All our house models are thought out to be energy-efficient, comfortable, spacious, functional, and affordable. We are designing houses for any kind of families and suiting various locations and environments. However, we also understand that a home has to be unique and correspond to its owners, this is why it is possible to customized all Palmatin models. Very often, the final house doesn’t have much left from the model, but a house model is a good start as a base, as an inspiration and to understand the needs. You can pick a house model and discuss your needs and the transformations you would like to bring in order to create a perfect and unique house.
Building a wooden house or prefabricated house on a construction site requires preliminary preparations and the availability of machines. You should first be ensured that the necessary and common tools (hammer, screwdrivers…) can be provided. To unload and move the log and prefabricated elements, a crane is necessary. A waste container might be placed to keep the site clean. Works-at-height have to be realized on a secured scaffolding. If a team is present on the construction site, additional material might be needed. Palmatin provides in advance the instructions and advice to prepare correctly the construction site.
Many factors can influence the duration of transportation and date of shipment and delivery. The transportation mean, the location of delivery, the weather, the road traffic and other unpredictable events can impact the transportation duration. In Europe and unless specific conditions apply, a driver is not allowed to drive more than 6 consecutive hours. At maximum, he can work 9 hours per day, 10 hours per night. Per week, a driver is limited to 48hours in average. At Palmatin, we organize the transportation of the materials so you can receive all the materials to the construction site as planned.
The delay of construction in the factory varies according to house features, complexity and details. In average, we estimate the production of a log house between 8 to 12 weeks.