Talk to our expert online, or call +372 605 4895
4674 houses made since 1995

Teele

2 Floors
3 Bedrooms
2 Bathrooms
159.3 m² Total area
159.3 m² Living area
65,2 m² Terrace/balcony area

Two-storey log house Teele is well-suited to a family with 2 children.

The house has 2 large terraces – on in front of the house and one in the back, perfect for sunbathing or outdoor dining. On the ground floor is a spacious and well-lighted living are with a fireplace, access to the second terrace and first floor.

The dining area is slightly separated from the living room and also has an access to the terrace as well as the separate kitchen on the opposite side of the house. Nest to the kitchen is the utility room for a washer and drier. Also on the ground floor is the master bedroom and a sauna with a bathroom and a spacious lounge.

On the first floor there are 2 more bedrooms and a second bathroom.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
This field is hidden when viewing the form
Newsletter
This field is for validation purposes and should be left unchanged.

  • 2 Large Terraces
  • Sauna & Lounge Included

Technical information

Number of bathrooms
2
Number of bedrooms
3
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
159.3 m²
Living area
159.3 m²
Terrace/balcony area
65,2 m²

Similar Houses

Helen

  • Floors: 2
  • Total area: 168 m²
  • Living area: 162.9 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 74 m²

Raivo

  • Floors: 2
  • Total area: 158.8 m²
  • Living area: 132.8 m²
  • Bedrooms: 3
  • Bathrooms: 1
  • Terrace/balcony area: 6.44 m²

Testimonials

Family Nõupuu (Log home Noupuu)

We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.

Family Ranna Log home

We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Jaan Köönvere

+372 605 48 95

Frequently Asked Questions

What changes can I make to Palmatin house models?

All our house models are thought out to be energy-efficient, comfortable, spacious, functional, and affordable. We are designing houses for any kind of families and suiting various locations and environments. However, we also understand that a home has to be unique and correspond to its owners, this is why it is possible to customized all Palmatin models. Very often, the final house doesn’t have much left from the model, but a house model is a good start as a base, as an inspiration and to understand the needs. You can pick a house model and discuss your needs and the transformations you would like to bring in order to create a perfect and unique house.

What machines are needed for construction on the plot?

Building a wooden house or prefabricated house on a construction site requires preliminary preparations and the availability of machines. You should first be ensured that the necessary and common tools (hammer, screwdrivers…) can be provided. To unload and move the log and prefabricated elements, a crane is necessary. A waste container might be placed to keep the site clean. Works-at-height have to be realized on a secured scaffolding. If a team is present on the construction site, additional material might be needed. Palmatin provides in advance the instructions and advice to prepare correctly the construction site.

How long does it take to deliver the house to the construction site?

Many factors can influence the duration of transportation and date of shipment and delivery. The transportation mean, the location of delivery, the weather, the road traffic and other unpredictable events can impact the transportation duration. In Europe and unless specific conditions apply, a driver is not allowed to drive more than 6 consecutive hours. At maximum, he can work 9 hours per day, 10 hours per night. Per week, a driver is limited to 48hours in average. At Palmatin, we organize  the transportation of the materials so you can receive all the materials to the construction site as planned.

How long does it takes to prepare the house at the factory?

The delay of construction in the factory varies according to house features, complexity and details. In average, we estimate the production of a log house between 8 to 12 weeks.