fbpx
Talk to our expert online, or call +372 605 4895
4524 houses made since 1995

Symphony

2 Floors
3 Bedrooms
3 Bathrooms
195.3 m² Total area
120.4 m² Living area
0 m² Terrace/balcony area

This product is Available Soon!

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
Newsletter
This field is for validation purposes and should be left unchanged.

  • Beautiful modern design
  • Well-lighted spacious living room

Technical information

Number of bathrooms
3
Number of bedrooms
3
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
195.3 m²
Living area
120.4 m²
Terrace/balcony area
0 m²

Similar Houses

Tiik

  • Floors: 2
  • Total area: 190 m²
  • Living area: 153.2 m²
  • Bedrooms: 2
  • Bathrooms: 2
  • Terrace/balcony area: 40 m²

Haab

  • Floors: 2
  • Total area: 200 m²
  • Living area: 200 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 20 m²

Testimonials

Log home Margus

The role of Sales consultant was very important. Your competitors (we tried three-four producers) sales consultants weren’t adequate. Palmatin sales consultant was very helpful and we always got information that we needed. The whole selling process was made professionally and this was the main reason why we selected Palmatin.

Family Nõupuu (Log home Noupuu)

We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Marko Valler

+372 605 48 95

Frequently Asked Questions

Can I extend the house after the construction?

Your family is growing and a need for space is felt? You are thinking about a conservatory from where to enjoy the garden view or you simply think more meter squares can add a plus to your home? From first glance, there are no restrictions to extend the house after completion. Nevertheless, there is a few things you might like to consider and steps to follow first: where should be the extension? Is the project manageable? What is the dedicated budget? Do I need a permit (depends on the size of the extension)? Etc. You can ask the opinion of an expert before starting your project to know if your idea is feasible or needs a few adjustments.

Do you have construction partners in X country?

As we deliver log and prefabricated houses all around the world, we have established partnerships with reliable local experts, able to help you quickly during the house construction. If you are interested in being helped by one of our partners, feel free to contact us so we will discuss the best solution for your project.

Do wooden homes place any special demands on utilities (pipe lines, sewer, etc.)?

Even though the log and prefabricated houses present different features and construction methods, it does not impact the construction and use of utilities. You can install any type of traditional utilities in the house. However, designing a new home is a great opportunity to take a look at clean and green sources.

Do I need a building permit to build a wooden house?

The constructions obligations can vary from a country to another. Generally speaking, when the building exceeds a certain size, the construction is subject to a permit. This concerns private properties as well. Before delivering a construction permit, the plans of the house, the location, the environment, the public safety and other factors will be analyzed. To know about the regulations, you should refer to your local administration. Make sure to obtain the building permit before starting the construction on the site.