Talk to our expert online, or call +372 605 4895
4624 houses made since 1995

Symphony

2 Floors
3 Bedrooms
3 Bathrooms
195.3 m² Total area
120.4 m² Living area
0 m² Terrace/balcony area

This product is Available Soon!

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
Newsletter
This field is for validation purposes and should be left unchanged.

  • Beautiful modern design
  • Well-lighted spacious living room

Technical information

Number of bathrooms
3
Number of bedrooms
3
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
195.3 m²
Living area
120.4 m²
Terrace/balcony area
0 m²

Similar Houses

Tiik

  • Floors: 2
  • Total area: 190 m²
  • Living area: 153.2 m²
  • Bedrooms: 2
  • Bathrooms: 2
  • Terrace/balcony area: 40 m²

Haab

  • Floors: 2
  • Total area: 200 m²
  • Living area: 200 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 20 m²

Testimonials

Family Ranna Log home

We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.

Family Roosve log house

We selected Palmatin thanks to fast feedback and informational webpage.  There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Marko Valler

+372 605 48 95

Frequently Asked Questions

What preparation to make on the construction site before the assembly of the house?

Before starting the assembly of the house, and even before receiving the delivery, it is primordial to check that the construction site is correctly prepared. Always check the security of the site for workers. The construction site has to be clean and the storage area prepared. You may also verify that the site is delimited and protected, to stop anyone not related to work from entering the construction site.

What changes can I make to Palmatin house models?

All our house models are thought out to be energy-efficient, comfortable, spacious, functional, and affordable. We are designing houses for any kind of families and suiting various locations and environments. However, we also understand that a home has to be unique and correspond to its owners, this is why it is possible to customized all Palmatin models. Very often, the final house doesn’t have much left from the model, but a house model is a good start as a base, as an inspiration and to understand the needs. You can pick a house model and discuss your needs and the transformations you would like to bring in order to create a perfect and unique house.

What is NOT included in the house offer and how much do these things cost?

The initial house offers are indicated in the documentation in free access that you can request on house website page. However, these elements are not the only one that we can provide. In order to provide you with an accurate offer and quotation, we also establish separated and personalized offers following your demands. The additional products that we can provide you with are detailed in our catalogues.

Is the size of the log house limited by the length of the logs?

The length of the logs do not limit the house dimensions. Thanks to various engineering solutions, such as details and finger joints, the wall sizes can vary as needed. Therefore, the house design can be very different and original from one construction to another. However, the lengths of materials are constrained by transportation rules and size restrictions.