Lepp is an elegant one-storey log house with a garage well-suited for someone who values open planning.
In front on of the house is a terrace, suitable for outdoor dining. Through the entrance to the left are two medium sized bedrooms and the master bedroom is on the opposite side of the house.
The house includes a sauna, a large bathroom and restroom. There is also space in between the sauna and bathroom, ideal for a washer and drier. Next to the bathroom is a second restroom.
The center of the house is a spacious living room full of light. There is also a fireplace in the living room for a warm and romantic feel. The living room is connected to an open kitchen and dining area, forming a wonderful united space for spending quality time with the family or friends.
The house also has a garage and an extra storage room for bicycles, tools etc.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
PALMATIN CUSTOMER STORY
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
Many factors can influence the duration of transportation and date of shipment and delivery. The transportation mean, the location of delivery, the weather, the road traffic and other unpredictable events can impact the transportation duration. In Europe and unless specific conditions apply, a driver is not allowed to drive more than 6 consecutive hours. At maximum, he can work 9 hours per day, 10 hours per night. Per week, a driver is limited to 48hours in average. At Palmatin, we organize the transportation of the materials so you can receive all the materials to the construction site as planned.
The size of the house and the logs used are influencing the settlement duration of the house. For example, the solid log profiles take longer to be installed than the glued laminated log profiles. Since the settlement is taken into notice during the engineering process you can move into your new home right away. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.
The size of the house is the main element influencing the settlement duration of a prefabricated house. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.
No, the length of the logs does not dictate the size of the house or individual rooms. The lengths of materials are only restricted by the measures of transportation.
Building a wooden house or prefabricated house on a construction site requires preliminary preparations and the availability of machines. You should first be ensured that the necessary and common tools (hammer, screwdrivers…) can be provided. To unload and move the log and prefabricated elements, a crane is necessary. A waste container might be placed to keep the site clean. Works-at-height have to be realized on a secured scaffolding. If a team is present on the construction site, additional material might be needed. Palmatin provides in advance the instructions and advice to prepare correctly the construction site.