Log house Aare is a modern looking two-storey family dwelling with a spacious living room and dining area.
On the ground floor there is a separate kitchen which allows more privacy. Opposite the kitchen is an office, which is great for some quiet working. Next to the office is a cosy bathroom with a sauna. Also on the ground floor is the master bedroom with access to the terrace.
On the first floor there are 2 more bedrooms and another bathroom.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
As we deliver log and prefabricated houses all around the world, we have established partnerships with reliable local experts, able to help you quickly during the house construction. If you are interested in being helped by one of our partners, feel free to contact us so we will discuss the best solution for your project.
The wooden houses are highly resistant and durable. With proper construction methods, innovative assembly systems and good maintenance, the house can last up to a hundred years. The wooden construction is also easier to maintain and to renovate than more traditional house types. Its structure benefits from the natural strength and solidity of the wood. The wooden houses are resistant to the climate conditions. With time, the wood will aged beautifully, bringing more charm and history to the construction.
Many factors can influence the duration of transportation and date of shipment and delivery. The transportation mean, the location of delivery, the weather, the road traffic and other unpredictable events can impact the transportation duration. In Europe and unless specific conditions apply, a driver is not allowed to drive more than 6 consecutive hours. At maximum, he can work 9 hours per day, 10 hours per night. Per week, a driver is limited to 48hours in average. At Palmatin, we organize the transportation of the materials so you can receive all the materials to the construction site as planned.
One square meter (1m2 = 10,7 sq. feet) of floor space costs between 500 – 1200 EUR. The price is influenced by the type of logs and other materials used, the location of the building etc.