Talk to our expert online, or call +372 605 4895
4654 houses made since 1995

Symphony

2 Floors
3 Bedrooms
3 Bathrooms
195.3 m² Total area
120.4 m² Living area
0 m² Terrace/balcony area

This product is Available Soon!

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
This field is hidden when viewing the form
Newsletter
This field is for validation purposes and should be left unchanged.

  • Beautiful modern design
  • Well-lighted spacious living room

Technical information

Number of bathrooms
3
Number of bedrooms
3
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
195.3 m²
Living area
120.4 m²
Terrace/balcony area
0 m²

Similar Houses

Tiik

  • Floors: 2
  • Total area: 190 m²
  • Living area: 153.2 m²
  • Bedrooms: 2
  • Bathrooms: 2
  • Terrace/balcony area: 40 m²

Haab

  • Floors: 2
  • Total area: 200 m²
  • Living area: 200 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 20 m²

Testimonials

Family Nõupuu (Log home Noupuu)

We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.

Family Roosve log house

We selected Palmatin thanks to fast feedback and informational webpage.  There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Marko Valler

+372 605 48 95

Frequently Asked Questions

Where is the wood harvested?

The wood comes from Nordic countries and forests. We careful select the wood for the constructions to insure the durability and quality of the houses. We have the FSC certification and most of the wood we use is coming from responsibly and carefully managed forests.

Can I install a fireplace in my wooden house?

The majority of our wooden houses and prefabricated houses can be equipped with a fireplace. During the fireplace installation, make sure to follow the safety rules and installation requirements. You can opt for a beautiful fireplace in your interior without fearing for the dwelling conditions. Using a fireplace is not without risks, therefore, we recommend careful attention when you lighting. You can discover some beautiful chimney and fireplace models right here!

Does the houses comply with the French RT2012 insulation standard?

In Europe, buildings represent approximately 40% of the total energy consumption and 36% of the CO2 emissions and are therefore the single largest energy consumer in Europe, ahead of industrial sectors. A house is considered as passive when its energy demand is lower than 15 kWh/ m²/ year and its total energy consumption (including cooling, domestic hot water, use of devices and technical equipment, lighting, ventilation and consumption linked to building use) does not exceed 120 kWh/ m²/ year. The RT 2012 norm considers a building as “low energy” as soon as its consumption is limited to 50 kWh/ m²/ year, including lighting, heating, air conditioning and hot water. The RT 2012 norm is based on renewable energy. To reduce energy consumption and building emissions, environmentally friendly and renewable energy sources (solar panels, heating pumps…) are efficient solutions. All Palmatin constructions are complying with the RT 2012 norm and reach the energy efficiency requirements.

How long does it take from the date of the order to delivery?

The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.