Jansen is a two-storey log house with a classical design, well-suited for a family with 2 children.
On the ground floor there is a large bathroom opposite the master bedroom. The spacious living room is connected to the dining area and open kitchen. The terrace can be accessed from the dining room. The large terrace provides great opportunities for a family dinner or outdoor birthday party.
On the first floor there are two bedrooms.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
The role of Sales consultant was very important. Your competitors (we tried three-four producers) sales consultants weren’t adequate. Palmatin sales consultant was very helpful and we always got information that we needed. The whole selling process was made professionally and this was the main reason why we selected Palmatin.
We selected Palmatin thanks to fast feedback and informational webpage. There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
It depends on the profile of the logs used. For solid log profiles the settlement is about 3-4% for every meter of height. If glued laminated log profiles are used you will have settlement around 1%. Since the settlement is taken into notice during the engineering process you can move into your new home right away.
The cost of foundations is influenced by the type and methods required (swallow, deep, etc…). The materials also influence the price, as well as the size of the house and its features. Usually, the foundation’s cost of a house is situated between 100 to 1000€ / m3 depending on the needs. To have a more precise estimation of the foundation’s cost for your project, you can request quotations to experts.
Like any other consumption goods, the VAT applied to the house cost is 20%.
Compare to other and more standard buildings, the log houses are easy and fast to assemble. As the houses are manufactured first in the factory, they can be delivered and assembled on the construction site at any moment of the year. However, it is important to keep a construction site clean from snow, leaves or debris, to ensure the safety of the workers and the good organisation on the site.