The high-quality stylish Palmatin prefab house ECO2 is a compact housing solution for families that value comfort and functionality. This house is ideal as a year-round residence or as a second home.
The house has a spacious living room with a separate kitchen, three bedrooms, separate toilet and bathroom, utility room and storage. The living room has convenient access to the house's outdoor terrace. It is always possible to change the interior layout according to your wishes.
The construction of ECO2 on the ready foundations takes about 3 days.
Benefiting from a long manufacturing experience, Palmatin produces premium quality prefabricated houses from certified materials. Palmatin's architects always plan the use of space in a house down to the last detail.
The architectural drawings are immediately available for building permit application. You can also always use the help of Palmatin's architects.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
We selected Palmatin thanks to fast feedback and informational webpage. There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Marko Valler
+372 605 48 95
All the wood used in our constructions is dried in our factory. The kiln drier ensures the removal of water and moisture in the wood. If the wood is not dried, the house structure can be damaged by distortions and swelling of the materials.
We are always pleased to realize the house dream of our clients. Therefore, a Palmatin house model can be used as well as personal house plans. Indeed, many of our projects clients are based on their own models. Contact us to discuss and realize your own project. You can share your floor and house plans with us, or work on the drawings together.
The size of the house and the logs used are influencing the settlement duration of the house. For example, the solid log profiles take longer to be installed than the glued laminated log profiles. Since the settlement is taken into notice during the engineering process you can move into your new home right away. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.
The size of the house is the main element influencing the settlement duration of a prefabricated house. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.
It depends on the profile of the logs used. For solid log profiles the settlement is about 3-4% for every meter of height. If glued laminated log profiles are used you will have settlement around 1%. Since the settlement is taken into notice during the engineering process you can move into your new home right away.