Talk to our expert online, or call +372 605 4895
4674 houses made since 1995

Prelude

2 Floors
3 Bedrooms
2 Bathrooms
129 m² Total area
77 m² Living area
42 m² Terrace/balcony area

Prelude is an emphatically respectable home. Self-assertiveness of the shapes acquire a playful connotation through the combination of horizontal wooden lining with plywood and wooden panels. Outdoor terrace extends around one corner of the building and can have a pool adjacent to it.

This will make a fine modern family home or a proper summer house for socialising, as there are plenty of possibilities to arrange cocktail parties.

Prelude, a stepped-silhouette prefabricated building, is a partially two-storey structure clearly inspired by functionalism. The first storey has a T-shaped layout. Southern side that faces the courtyard connects the living room to the kitchen and dining room. All rooms are well-lit and overlook the garden with dwarf trees.

There are also two bedrooms on the first storey. The building complex includes a covered car parking space and a shed next to the main entrance.

Upstairs is one bedroom with a wardrobe and a private bathroom – and with great views to surroundings.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
This field is hidden when viewing the form
Newsletter
This field is for validation purposes and should be left unchanged.

  • Fine Modern Family Home
  • Spacious planning

Technical information

Number of bathrooms
2
Number of bedrooms
3
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
129 m²
Living area
77 m²
Terrace/balcony area
42 m²

Similar Houses

Kirss

  • Floors: 2
  • Total area: 185 m²
  • Living area: 185 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 38 m²

Tiik

  • Floors: 2
  • Total area: 190 m²
  • Living area: 153.2 m²
  • Bedrooms: 2
  • Bathrooms: 2
  • Terrace/balcony area: 40 m²

Testimonials

foundations
PALMATIN CUSTOMER STORY

PALMATIN CUSTOMER STORY

Family Roosve log house

We selected Palmatin thanks to fast feedback and informational webpage.  There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Marko Valler

+372 605 48 95

Frequently Asked Questions

Can I visit the factory?

We are always thrilled to welcome our clients in our offices and factory. During the visit, you can discover the different steps of the construction and the construction methods.  Don’t hesitate to contact us to plan a visit.

What are the different steps when I buy a house with Palmatin?

You think about building your house, and you are ready to move forward with this beautiful project? Here are the steps when buying a house with Palmatin. First, contact us to discuss your project, needs and expectations. Based on your requirements, we establish an accurate quotation. If you accept the project, we agree and start working on the design and drawings. We carefully inspect all the technical aspects and engineering details of the construction. If you are satisfied, we launch the production of the house at our factory. After a few months from the project start, the house is ready and transported to the construction site, where it will be assembled during few weeks only.

How long does it take to deliver the house to the construction site?

Many factors can influence the duration of transportation and date of shipment and delivery. The transportation mean, the location of delivery, the weather, the road traffic and other unpredictable events can impact the transportation duration. In Europe and unless specific conditions apply, a driver is not allowed to drive more than 6 consecutive hours. At maximum, he can work 9 hours per day, 10 hours per night. Per week, a driver is limited to 48hours in average. At Palmatin, we organize  the transportation of the materials so you can receive all the materials to the construction site as planned.

Is Palmatin producing the houses ?

At Palmatin, we design the houses and projects in our offices and produced in our factory in Estonia. It can be house models, modified models or clients projects. Our production is local and under control and certifications, ensuring the best quality.