Haab is a comfortable two-storey log house rich in detail.
On the ground floor there is a roomy study and a bathroom. In the centre of the house is an open kitchen connected with the dining area. Next to the kitchen is a spacious and well-lighted living room with access to the terrace. There is also a fireplace in the living room giving it a warm and romantic touch.
On the first floor there are 3 bedrooms – 2 medium sized and one master bedroom with a separate wardrobe and balcony. In addition there is a second bathroom on the first floor.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We selected Palmatin thanks to fast feedback and informational webpage. There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Marko Valler
+372 605 48 95
You think about building your house, and you are ready to move forward with this beautiful project? Here are the steps when buying a house with Palmatin. First, contact us to discuss your project, needs and expectations. Based on your requirements, we establish an accurate quotation. If you accept the project, we agree and start working on the design and drawings. We carefully inspect all the technical aspects and engineering details of the construction. If you are satisfied, we launch the production of the house at our factory. After a few months from the project start, the house is ready and transported to the construction site, where it will be assembled during few weeks only.
The environment protection is one of our essential pillars and objectives. To build wooden houses and respect environment, we focus on our production and the management of our products. The FSC certifications attest that the wood materials are coming from controlled plantations. We support the renewal of the forests. In our constructions, we use toxin-free glue, that does not interact with the environment. Plus, the wood is an ecological, biodegradable and renewable material. About the production, we have organised our process to manage our environmental impact. Our ecological and certified waste-free production allows us to reduce energy consumption. We avoid releasing unfriendly elements in the nature. The wooden waste from the production is collected and reused. We use sawdust and kiln driers to warm the factory. Also, suction system prevents the sawdust and warmth from being rejected in the environment. We work to provide a sustainable environment for the years to come.
The erection costs are directly related to the amount of work needed and to the location of the new house. When doing primary calculations, you should consider the costs to be around 30% (+-5%) of the house price.
In Europe, buildings represent approximately 40% of the total energy consumption and 36% of the CO2 emissions and are therefore the single largest energy consumer in Europe, ahead of industrial sectors. A house is considered as passive when its energy demand is lower than 15 kWh/ m²/ year and its total energy consumption (including cooling, domestic hot water, use of devices and technical equipment, lighting, ventilation and consumption linked to building use) does not exceed 120 kWh/ m²/ year. The RT 2012 norm considers a building as “low energy” as soon as its consumption is limited to 50 kWh/ m²/ year, including lighting, heating, air conditioning and hot water. The RT 2012 norm is based on renewable energy. To reduce energy consumption and building emissions, environmentally friendly and renewable energy sources (solar panels, heating pumps…) are efficient solutions. All Palmatin constructions are complying with the RT 2012 norm and reach the energy efficiency requirements.