Talk to our expert online, or call +372 605 4895
4744 houses made since 1995
Palmatin - ECO2

ECO1

1 Floors
3 Bedrooms
1 Bathrooms
99.6 m² Total area
81.5 m² Living area

The high-quality stylish Palmatin prefab house ECO1 is a compact housing solution for families that value comfort and functionality. This house is ideal as a year-round residence or as a second home.

The house has a spacious living room with a separate kitchen, three bedrooms, separate toilet and bathroom, utility room and storage. The living room has convenient access to the house's outdoor terrace. Inside, it is also possible to add a nice fireplace or wood burner.

The construction of ECO1 on the ready foundations takes about 3 days.

Benefiting from a long manufacturing experience, Palmatin produces premium quality prefabricated houses from certified materials. Palmatin's architects always plan the use of space in a house down to the last detail.

The architectural drawings are immediately available for building permit application. You can also always use the help of Palmatin's architects.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Title
This field is hidden when viewing the form
Newsletter

Floor plans

Technical information

Number of bathrooms
1
Number of bedrooms
3
Number of floors
1
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
99.6 m²
Living area
81.5 m²
Terrace/balcony area

Similar Houses

Palmatin - ECO1

ECO2

  • Floors: 1
  • Total area: 98 m²
  • Living area: 79.6 m²
  • Bedrooms: 3
  • Bathrooms: 1
Palmatin - ECO5

ECO5

  • Floors: 1
  • Total area: 102.2 m²
  • Living area: 87.4 m²
  • Bedrooms: 4
  • Bathrooms: 1

Testimonials

Log home Margus

The role of Sales consultant was very important. Your competitors (we tried three-four producers) sales consultants weren’t adequate. Palmatin sales consultant was very helpful and we always got information that we needed. The whole selling process was made professionally and this was the main reason why we selected Palmatin.

foundations
PALMATIN CUSTOMER STORY

PALMATIN CUSTOMER STORY

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    The Basic Package includes everything you need to start building your home: the production approval drawings, insulated exterior wall elements, “Pre-Cut” constructions for the internal load-bearing walls, waterproofing, roof constructions with underlay fabric, and ventilation strips. For multi-storey houses, the package also includes “Pre-Cut” constructions for the partition ceilings. With the Basic Package, you will receive all the main construction details of your house. And whenever you need help or advice, you’re always welcome to contact our friendly specialists or visit us for a consultation.

  • Standard

    The Standard Package includes everything from the Basic Package, plus all the materials needed to make your house beautiful on the outside. This means it comes with the exterior wall covering, mouldings, skirting boards, terraces, balconies, and wind protection materials. It’s the perfect choice if you want your house to look ready from the outside quickly and then finish the inside at your own pace. You can also add doors and windows to your order, and depending on your house design, the windows can even be installed directly at the factory to make the process faster and easier for you.

  • Premium

    The Premium Package includes everything from the Basic and Standard packages, plus all the materials needed to build the interior walls and ceilings up to the building boards. All the necessary, uninstalled building boards and fastening accessories are carefully packed for you. This is our most convenient package, providing everything you need to complete the house structure quickly and easily. In this package, you can also add exterior doors, windows, interior doors, stairs, and stair railings (for multi-storey houses). Roofing materials can also be included if you wish. The Premium Package is designed to offer you as many materials and solutions as you need, ensuring the most comfortable and efficient building process.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Leo Lindman

+372 605 48 95

Frequently Asked Questions

How long to build a log / prefabricated house?

The size of the house and the logs used are influencing the settlement duration of the house. For example, the solid log profiles take longer to be installed than the glued laminated log profiles. Since the settlement is taken into notice during the engineering process you can move into your new home right away. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.

The size of the house is the main element influencing the settlement duration of a prefabricated house. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.

Can I extend the house after the construction?

Your family is growing and a need for space is felt? You are thinking about a conservatory from where to enjoy the garden view or you simply think more meter squares can add a plus to your home? From first glance, there are no restrictions to extend the house after completion. Nevertheless, there is a few things you might like to consider and steps to follow first: where should be the extension? Is the project manageable? What is the dedicated budget? Do I need a permit (depends on the size of the extension)? Etc. You can ask the opinion of an expert before starting your project to know if your idea is feasible or needs a few adjustments.

Can I build the log house myself?

If you are looking for adventure and enriching experience, you can, of course, decide to build the log house by yourself. The construction on site consists of assembling the different elements, following the instructions. Our advice would be to consider in advance all the positive and negative aspects to not underestimate the work before starting. You can contact us for advice and assistance at any step of the assembly.

How long does it take from the date of the order to delivery?

The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.