Talk to our expert online, or call +372 605 4895
4764 houses made since 1995
Palmatin - ECO2

ECO1

1 Floors
3 Bedrooms
1 Bathrooms
99.6 m² Total area
81.5 m² Living area

The high-quality stylish Palmatin prefab house ECO1 is a compact housing solution for families that value comfort and functionality. This house is ideal as a year-round residence or as a second home.

The house has a spacious living room with a separate kitchen, three bedrooms, separate toilet and bathroom, utility room and storage. The living room has convenient access to the house's outdoor terrace. Inside, it is also possible to add a nice fireplace or wood burner.

The construction of ECO1 on the ready foundations takes about 3 days.

Benefiting from a long manufacturing experience, Palmatin produces premium quality prefabricated houses from certified materials. Palmatin's architects always plan the use of space in a house down to the last detail.

The architectural drawings are immediately available for building permit application. You can also always use the help of Palmatin's architects.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Title
This field is hidden when viewing the form
Newsletter

Floor plans

Technical information

Number of bathrooms
1
Number of bedrooms
3
Number of floors
1
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
99.6 m²
Living area
81.5 m²
Terrace/balcony area

Similar Houses

Palmatin - ECO1

ECO2

  • Floors: 1
  • Total area: 98 m²
  • Living area: 79.6 m²
  • Bedrooms: 3
  • Bathrooms: 1
Palmatin - ECO5

ECO5

  • Floors: 1
  • Total area: 102.2 m²
  • Living area: 87.4 m²
  • Bedrooms: 4
  • Bathrooms: 1

Testimonials

Family Ranna Log home

We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.

foundations
PALMATIN CUSTOMER STORY

PALMATIN CUSTOMER STORY

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    The Basic Package includes everything you need to start building your home: the production approval drawings, insulated exterior wall elements, “Pre-Cut” constructions for the internal load-bearing walls, waterproofing, roof constructions with underlay fabric, and ventilation strips. For multi-storey houses, the package also includes “Pre-Cut” constructions for the partition ceilings. With the Basic Package, you will receive all the main construction details of your house. And whenever you need help or advice, you’re always welcome to contact our friendly specialists or visit us for a consultation.

  • Standard

    The Standard Package includes everything from the Basic Package, plus all the materials needed to make your house beautiful on the outside. This means it comes with the exterior wall covering, mouldings, skirting boards, terraces, balconies, and wind protection materials. It’s the perfect choice if you want your house to look ready from the outside quickly and then finish the inside at your own pace. You can also add doors and windows to your order, and depending on your house design, the windows can even be installed directly at the factory to make the process faster and easier for you.

  • Premium

    The Premium Package includes everything from the Basic and Standard packages, plus all the materials needed to build the interior walls and ceilings up to the building boards. All the necessary, uninstalled building boards and fastening accessories are carefully packed for you. This is our most convenient package, providing everything you need to complete the house structure quickly and easily. In this package, you can also add exterior doors, windows, interior doors, stairs, and stair railings (for multi-storey houses). Roofing materials can also be included if you wish. The Premium Package is designed to offer you as many materials and solutions as you need, ensuring the most comfortable and efficient building process.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Leo Lindman

+372 605 48 95

Frequently Asked Questions

Is the size of the log house limited by the length of the logs used?

No, the length of the logs does not dictate the size of the house or individual rooms. The lengths of materials are only restricted by the measures of transportation.

How much does it costs to have the manufacturer build the house?

The erection costs are directly related to the amount of work needed and to the location of the new house. When doing primary calculations, you should consider the costs to be around 30% (+-5%) of the house price.

How long to build a log / prefabricated house?

The size of the house and the logs used are influencing the settlement duration of the house. For example, the solid log profiles take longer to be installed than the glued laminated log profiles. Since the settlement is taken into notice during the engineering process you can move into your new home right away. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.

The size of the house is the main element influencing the settlement duration of a prefabricated house. In average, the house takes a few weeks to be assembled. Remember also that a carefully prepared construction site helps saving time.

Where is it possible to meet you?

We will be pleased to meet you and discuss your project! Our offices are located in Estonia, near the capital Tallinn. To arrange an appointment you can contact us by email: info@palmatin.ee – or call us: +372 605 4895. You can also find more information here.